Wellcome to National Portal
মেনু নির্বাচন করুন
Main Comtent Skiped

Project Name
District Highway Upgradation Project at Proper Standards and Width (Khulna Zone) (Satkhira Part)
Details

District Highway Upgradation Project at Proper Standards and Width (Khulna Zone) (Satkhira Part)

1. Satkhira-Asashuni-Goaldanga-Paikgachha Road (Z-603) (Satkhira Part)

2. Asashuni-Shyamnagar Road (Z-617)

3. Bangsipur-Munshiganj Road (Z-609)

Construction of road embankment, strengthening of existing pavement, surfacing, construction of concrete U drain, R, C, C palacing, traffic sign signal, road marking and installation of kilometer post

Total length of road =  88.26 km

Start
01/07/2018
End
30/06/2021
Project Type
adb
Amount
৮৭৩৪.৪৫ লক্ষ টাকা
Latest Status
02/11/2020
label.Details.title

District Highway Upgradation Project at Proper Standards and Width (Khulna Zone) (Satkhira Part)

1. Satkhira-Asashuni-Goaldanga-Paikgachha Road (Z-603) (Satkhira Part)

2. Asashuni-Shyamnagar Road (Z-617)

3. Bangsipur-Munshiganj Road (Z-609)

Construction of road embankment, strengthening of existing pavement, surfacing, construction of concrete U drain, R, C, C palacing, traffic sign signal, road marking and installation of kilometer post

Total length of road =  88.26 km

Attachments